Maintenance 1 |
Repairing the floor spring (for office entrance glass door) |
Maintenance 3 |
FCU (Fan Coil Unit) - clean up the filter and drainage pipe, checking fuctions |
Maintenance 5 |
Touch up paint for the ceiling |
Maintenance 7 |
Touch up paint for the floor |
Maintenance 2 |
Repairing the sensor of urinal |
Maintenance 4 |
AC (Air Conditioning) outdoor unit - chemical clean and checking the pressure of the refrigerator gas |
Maintenance 6 |
Regular cleaning of Automatic Drainage system (pantry sink) |
Maintenance 8 |
Check and change the fluorescent light and starter |